Cable Installation Services NW Ltd successfully completes the installation of the cables to level 63 of Tower D at the Owen Street development, this is the second tallest residential block in Europe so no mean feat to install these cables. The project entailed installing 2 No 4c x 240mm2 XLPE/SWA/LSF 200m in length each, from ground level to level 63. We developed a purpose made lifting system, designed and built in house, tested to PUWER regs. The cables went in with no issues in 1 straight pull. Well done to Jason and his gang for a first class install.